FLORIDATRADESMENFind a company
Florida city directory

Specialist services in Treasure Island

Treasure Island owners can enquire about marine structures through Speeler Gibson and ground or foundation support through Foundation Services. Some projects may involve both waterfront and building concerns, but the assessments should identify the actual structures affected. Establish the repair boundary before comparing wall replacement, support methods or optional waterfront improvements in one overall budget.

Company information reviewed 2026-10-30. See individual profiles for sources.

Identify the waterfront components under review

Speeler Gibson designs and constructs seawalls and also works on docks, lifts, caps and tiebacks. Its material range includes vinyl and composite sheet piling. Ask which components can remain and which require replacement, with drawings and permit responsibilities defined rather than assuming every adjoining marine feature will be rebuilt.

Separate building support from marine construction

Foundation Services offers grouting, underpinning and new-construction piling, together with seawall repair. Describe the observed movement and request the basis for its recommended method. Where another marine contractor is involved, agree the division of work and the condition each crew expects before starting its stage.

Companies serving Treasure Island

Company website researched

Foundation Services of Central Florida

Foundation Repair · Sinkhole Repair · Concrete Lifting

Advertised coverage: Treasure Island

Foundation Services of Central Florida offers foundation underpinning and sinkhole remediation. Its related Stable Soils brand provides concrete lifting and soil stabilization; the brands are conservatively grouped because they share a published contact number.

Coverage evidence: Company source 1 ↗

Call 352-622-9218

Coverage is based on company website statements. An office in or near Treasure Island is not used as proof that a company serves the city.

Compare project scope in Treasure Island

Planning specialist work in Treasure Island

Does a seawall proposal necessarily replace the dock too?

No. Speeler Gibson offers both, but retained and replaced components should be itemized in the agreed scope.

Can seawall material choices be discussed during design?

Vinyl and composite sheet-piling options are advertised. Ask which design and site considerations support the recommendation.

Does Foundation Services offer support before a new building?

New-construction piling is part of its range, separate from repairs to existing foundations.

What helps when two contractors assess adjoining structures?

Provide the same site information and require clear work boundaries, sequencing and handover conditions between their proposals.

Other places served by these companies

Local sources and project references